Skip to main content

Environmental & Durability

Measurement Capability :

Parameter/Test Range/Accuracy/Specifications

Bump Test

No. of Bumps: 1000 /4000,  Pulse Duration : 6 m Sec, 10g to 40g,  +/-20% IS:9000 / IEC 60068/JSS/QM333.

Shock Test

Acc : 150m/s2 to 100 m/s2 Duration of Pulse : 18 , 11, 6 m sec. Pulse shape : Half sine, 15% to +20%, IS:9000 / IEC 60068

Vibration Test (Sine & Random)

Max. Force: 2000 Kgf (Peak Sine), 2000 Kgf ( RMS Random), Freq: 5Hz-2KHz, Displacement: 50.0 mm (P-P), Acc: 50 m/sec2,

PSD: 10g RMS, Sine: IS: 9000 Pt (VIII):1981-Reaff.2004-Reaff.2003,IEC 60068-2-6:2007-12, JSS 55555:2012,

Random: IEC 60068-2-35, 36,37:2006, IEC 60571: 2012, IEC 61373: 2010.

Drop/ Topple / Free Fall Test

IS: 9000, P-VII :2006, JSS: 55555: 2012, QM: 333 March 2010.

Dry Heat Test

Temp.: 40 to 200ºC/±2ºC, IS: 9000 Pt (III):1977-Reaff.2004, IEC 60068-2-2:2007, IEC 60571: 2012, JSS 55555:2012.

Cold Test

Temp.: -40ºC to +10º /±3ºC, IS:9000 Pt(II):1977-Reaff.2004, IEC 60068-2-1:1990, IEC 60571: 2012, JSS 55555:2012.

Damp Heat (Steady State) Test

Temp.:30ºC/40ºC ±2ºC, R.H:95±3%, IS: 9000 Pt (IV):1981-Reaff.2004, IEC 60068-2-78:2001, IEC 60571: 2012,

JSS 55555:2012.

Damp Heat (Cyclic) Test

Temp.:40ºC,55ºC,65ºC/±2ºC, R.H: (50 to 95) ±3%, IS: 9000 Pt (V):1981, IEC 60068-2-30:2005

Corrosion (Salt Spray) Test

Temp.:35ºC/±2ºC, R.H: 50 to 95%/±3% i) Seven Salt Solution ii) 20% or 5% NaCl Solution, IS: 9000 Pt (XI):1983-Reaff.2004,

IEC 60068-2-11:1981

Temperature Cycling/ Change of Temperature

Temp.:- 40ºC to 175ºC , Rate of change 1ºC, IS: 9000 Pt (XIV):1981-Reaff.2003, IEC 60068-2-14:2009.

Ingress Protection for enclosures.

Up to IP X7 and IP 6X,Cat  I & II, IEC 60529: 2013

Driving Rain Test

At Ambient temperature, IS: 9000 P: XVI:1983-Reaff.2016, JSS 55555:2012.

 

 

 

 

List Of Major Facility

Facility / Equipment / Tools Make and Model

SALT SPRAY TEST CHAMBER

CME EQUIPMENT.

CLIMATIC WALK IN TEST CHAMBER

WEISS TECHNIK.

CLIMATIC TEST CHAMBER

WEISS TECHNIK.

CLIMATIC TEST CHAMBER

CME EYUIPMENT.

CLIMATIC TEST CHAMBER

KASCO INDUSTRIES.

DUST TEST CHAMBER (IP)

KASCO INDUSTRIES.

WATER TEST SET UP (IP)

------

RAIN TEST SET UP

------

Major Products Tested / Projects Done
Control Electronics related to Defence projects and Railways,
Various types of Enclosures,
Conveyor Belt machine (Scanner),
Assembled PCBs,
Temperature Sensors.